Join the Community Mail Twitter Facebook YouTube Pinterest Blog

View Cart
(0 items: $0.00) 
Facebook Twitter

Icon Icon Icon Icon Icon Icon Icon Icon

  Home > PATCHES > Patches by NASA Mission >

  STS-129 Mission Patch
STS129 Mission Patch


 
Our Price: $5.95

Product Code: MP129
Qty:

Description
 
STS-129 Mission Patch

Space Shuttle Mission STS-129 is scheduled to be flown by Space Shuttle Atlantis. STS-129 is a mission to the International Space Station. The launch date for the mission is scheduled for November 12, 2009.The primary focus for STS-129 will be staging spare components outside the station. The 11-day flight is scheduled to include at least three spacewalks. The payload bay will carry two large External Logistics Carriers holding two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly, a spare latching end effector for the station's robotic arm, a spare trailing umbilical system for the Mobile Transporter, and a high-pressure gas tank.

STS-129 Mission Details:
  • Mission name: STS-129
  • Space Shuttle: Atlantis
  • Launch pad 39A
  • Launch date NET November 12, 2009 16:11 EST
  • Landing November 23, 2009
  • Mission duration 11 days
  • Commander: Charles O. Hobaugh
  • Pilot: Barry E. Wilmore
  • Mission Specialist 1: Michael Foreman
  • Mission Specialist 2: Randolph Bresnik
  • Mission Specialist 3: Leland D. Melvin
  • Mission Specialist 4: Robert Satcher

  • Share your knowledge of this product. Be the first to write a review »