STS-131 Mission Patch

STS-131 is targeted for launch on April 5th, 2010. STS-131 mission will be flown by Space Shuttle Discovery, The primary payload is scheduled to be a Multi-Purpose Logistics Module. The mission will also perform an R&R on an ammonia tank assembly outside the station and return a LWAPA plate, located on the Columbus module. The mission also includes several on-board payloads, this mission has the most payloads since STS-107.
  • Mission name STS-131
  • Space shuttle Discovery
  • Launch pad 39A
  • Launch date NET April 5th, 2010
  • Landing NET April 18th, 2010
  • Mission duration 13 days
General
Features

Write a review

Note: HTML is not translated!
    Bad           Good

STS-131 Mission Patch

  • Product Code: MP131
  • Availability: In Stock
  • Price $6.95